603
not been considered advisable by the Chief Resident
Engineer to extend the reclamation up to Blackhead's Lots
I should have advocated the resumption of these lots at
the present time believing that if they are left in private
hands they will hamper extension in the future and will
eventually have to be purchased at a much higher price
than is now asked for them. For this reason also I am not
in favour of the proposal contained in paragraph 20 of the
Chief Resident Engineer's letter of February 15th. to
acquire only the inner parts of the Marine Lots.
10.
I have now the honour to request
Your Lordship's approval to the proposals contained in
this Despatch, viz.:-
(1).
To extend the reclamation in Hung-
-hom Bay in a Southerly direction till it abuts on Kowloon
Marine Lot No. 81 at an addition not exceeding seven
hundred thousand dollars ($700,000) to the original
estimate of five hundred and eighty-five thousand dollars
($585,000) the section of wharf wall along the extension
being left to the Consulting Engineers for determination;
(11).
to resume Kowloon Marine Lota
Nos. 34 and 81 and Kowloon Inland Lot No. 210 at a cost
not